ProjectsKrumovgrad Gold Project- Period
- 2012–2018
- Client
- Dundee Precious Metals
- Location
- Open in Google Maps ↗
Krumovgrad Gold Project
A greenfield open-pit mining project incorporating a complete processing plant with conventional crushing, grinding and flotation processes, together with an integrated mine waste facility.
IRCON Ltd. developed the Civil & Structural, Architectural, Roads, Earthworks, Fire Safety, and Health & Safety design components of the project.
ROM Pad — Ada Tepe Process Plant
- Period
- 2015–2016
- Client
- Amec Foster Wheeler
The ore stockpile at the open-pit mine near Krumovgrad is a large earth structure reaching up to 60 metres in height. It includes a rainwater collection system. Ircon Ltd. carried out the engineering analysis and design of the facility, including a computer-based structural and soil analysis.
Reinforced Earth Retaining Wall — Ada Tepe, Krumovgrad
- Period
- 2015–2016
- Client
- Amec Foster Wheeler
A 16.5-metre-high reinforced earth wall was built between the ore stockpile and the crushing plant at the Ada Tepe mine. The structure uses the “Terre Armée” system and was designed to support heavy mining vehicles. It is described as the highest heavy-duty wall of this type in Bulgaria.
Water Tanks — Krumovgrad Gold Project
- Period
- 2015–2016
- Client
- Amec Foster Wheeler
The process plant at the gold mine near Krumovgrad uses a system of water tanks designed and engineered by Ircon Ltd. The tanks form part of the site’s water management system.
Ircon Ltd. · Bulgaria, Sofia 1138, 2 L Samokovsko shose str. · +359 2 917 54 00 · office@irconltd.com · www.irconltd.com