Ircon Ltd., The Technological Solutions
EN БГ

Projects

Underground Ore Crushing, Sorting and Transportation Facility

Period
2011–2012
Client
Dundee Precious Metals JSC

The facility is an underground plant located within the galleries of the Chelopech mine. It was designed for crushing, sorting and transporting extracted ore. As part of the project, Ircon Ltd. designed the steel structures, hoppers and chutes, as well as almost 4,000 metres of underground conveyor galleries and their supporting stations.