Projects
Business Center Entra
- Period
- 2000–2002
- Client
- CPM International
A 10-storey multifunctional office building originally designed for common use and later adapted to accommodate a bank administration.
One of the project's notable engineering challenges was its foundation system, designed to bridge over the underground collector of the Perlovska River.
IRCON Ltd. was responsible for the design across all disciplines.
Ircon Ltd. · Bulgaria, Sofia 1138, 2 L Samokovsko shose str. · +359 2 917 54 00 · office@irconltd.com · www.irconltd.com





