Ircon Ltd., The Technological Solutions
EN БГ

Projects

Business Center Entra

Period
2000–2002
Client
CPM International

A 10-storey multifunctional office building originally designed for common use and later adapted to accommodate a bank administration.

One of the project's notable engineering challenges was its foundation system, designed to bridge over the underground collector of the Perlovska River.

IRCON Ltd. was responsible for the design across all disciplines.