Multifunctional Sport Hall Sofia
IRCON is the engineering bureau of the project and develops its main engineering parts. IRCON LTD supports the main partner GLAVBOLGARSTROY AD in the process of the realization through author supervision on site and in the steel structure production plant. The architectural part is developed by TILEV ARCHITECTS LTD.
IRCON is the engineering bureau of the project and develops its main engineering parts. IRCON LTD supports the main partner GLAVBOLGARSTROY AD in the process of the realization through author supervision on site and in the steel structure production plant. The architectural part is developed by TILEV ARCHITECTS LTD.



